AGLC DISTRIBUTION CENTRE

Date: August 2016 – October 2018

Description: The primary objective of this project is to construct a 50,700 m2 liquor distribution centre for the Alberta Gaming and Liquor Commission. This work is to include both office and warehouse space, as well as a bonded trailer yard.

Involvement: We were pleased to be involved in this project by providing roof progress quality assurance reviews and drawing reviews, working alongside Alberta Infrastructure and their incredible team.

Architect: ONPA Architecture


BLOCK BG

Date: August 2021 – March 2022

Description: “ICE Block BG is a perfectly blended mix of comfortable residential space (Block B) combined with pure retail attraction space (Block G). This marriage of form and function boasts over 200,000 square feet in the heart of Edmonton’s ICE District.

This building is in a prime location and is surrounded by Rogers Place, Stantec Tower and the City of Edmonton Tower. In addition to the amenities right outside the front door, this building will also be home to two large format restaurants, and a 23,000 square foot second floor supermarket. ICE Block BG will also have approximately 8,000 square feet of dedicated indoor residential amenity space that will spill out to an outdoor rooftop area.”
(https://www.probuspm.com/ice-block-bg)

Involvement: Goodwin Inspections provided quality assurance reviews during construction and continues to assist the Owner with annual inspections to outline required maintenance and assist with lengthening the life of the roof.

Architect: DIALOG


BREWERY DISTRICT

Date: July 2015 – Present

Description: “The Edmonton Brewery District accommodates an urban lifestyle with its unique blend of products and services – all conveniently located within a short distance. Visit Good Life Fitness for your morning work-out, grab a well-deserved specialty coffee at Starbucks and shop Loblaw’s City Market – the first of its kind in Edmonton – where you’ll enjoy a patisserie, cheese shop and extensive fresh/specialty food section.”
(http://brewerydistrictedmonton.ca/)

Involvement: Goodwin Roof Inspections has been involved in many layers of The Brewery District, including quality assurance observation reviews, roof assessment reports and ongoing client care with the amazing property management team.

Architect: Dialog Architecture


CITY OF EDMONTON TOWER - ICE DISTRICT

Date: November 2015 – September 2017

Description: Block D is a 29-storey tower comprised of: a 3-storey podium (2 floors of lobby/retail/commercial space and 1 floor of office space) 24 floors of office space, a 2-storey mechanical space, and a 4-storey below grade parkade. The below grade parkade will have approximately 507 parking stalls divided between monthly parking and hourly parking. Block D will provide for some 2,300 occupants of a variety of professional office support services. The project is to target LEED Gold Certification

Involvement: The City of Edmonton Tower was an honour to work on, alongside Stantec Architecture. We were involved through document review and roof progress quality assurance reviews. 

Architect: Stantec Architecture


DR. ANNE ANDERSON HIGH SCHOOL

Date: June 2020 – January 2021

Description: “Dr. Anne Anderson High School, in Heritage Valley, will accommodate grades 10, 11, and 12 for the 2023-24 and 2024-25 school years.

Dr. Anne Anderson School offers regular and Advanced Placement programming within a 21st century learning environment. Our goal is to help our students achieve their dreams as they interact in our academic setting structured around rigour and high expectations. In keeping with Dr. Anne Anderson’s legacy of respect and compassion for all, the engagement of students, parents, faculty and community in learning and all aspects of school life will always be encouraged and valued here.”
(https://anneanderson.epsb.ca/about/)

Involvement: Goodwin was pleased to provide roof quality assurance reviews during the construction of this impressive roof.  

Architect: BR2 Architecture


FAIRVIEW PROVINCIAL BUILDING

Date: March 2022 – October 2023

Description: The Fairview Provincial Building houses both the Town of Fairview Administration Offices and the Provincial Courthouse, serving those in the town of Fairview and surrounding areas.

Involvement: Goodwin was contracted through Alberta Infrastructure to act as Prime Consultant in this re-roofing project. This consisted of creating a specification for the re-roof, tendering assistance and quality assurance reviews during the work.  


FALCON ONE

Date: May 2023 – May 2024

Description: Located South of Jasper Avenue on Edmonton’s 104th Street Promenade, Falcon One connects downtown’s most sought-after street to the River Valley. Residents are just steps away from destination shopping, the world renowned 104th street summer farmers market, world class entertainment, sports, Rogers Place and downtown nightlife. The University of Alberta and Northern Alberta Institute of Technology (NAIT) campuses are conveniently accessible within minutes via the nearby Bay Enterprise Square LRT station, while MacEwan University is just a short walk away.
(https://www.rentfalcon.ca/)

Involvement: Goodwin provided quality assurance building envelope reviews on this project, working with a fantastic team to help bring this building together.

Architect: arcSTUDIO


FOX LAKE ELEMENTARY SCHOOL

Date: March 2018 – October 2022

Description: Fox Lake Elementary School has over 400 students registered from grades Head Start to grade 6. There is a staff of 60 people working in numerous positions within the school. Our school is brand new – built in 2011 with 23 classrooms, plus a music room, gym and library.
(https://lrrcn.ab.ca/programs-services/education/fox-lake-elementary-school/)

Involvement: Goodwin was obtained to assist the Owner with determining the next steps for the existing roof. This started with providing an assessment and report of the existing roof system to allow the Owner to budget as needed in the coming years, either for replacement or repairs. It was found the roof was needing replacement and Goodwin assisted with providing a specification for this replacement and completed a number of quality assurance reviews during the re-roofing process.


GARNEAU REDEVELOPMENT PROJECT

Date: September 2021 - June 2024

Description: Maclab Garneau is a two-tower development proposal by Maclab Development Group and Diamon Schmitt Architects near the University of Alberta Campus, consisting of a student residence tower, a market rental tower, commercial frontage on 112 Street, and townhouse units lining 86 Avenue.
(https://edmonton.skyrisecities.com/database/projects/maclab-garneau.35623)

Involvement: Goodwin Inspections provided quality assurance reviews during the construction of this new high-rise in Edmonton’s centre.

Involvement: Diamond Schmitt Architects


HORIZON DISTRIBUTION WAREHOUSE

Date: May 2019 – June 2020

Description: The Horizon project consists of a one-million square foot warehouse and logistics building. Its 58-acre site in the Border Business Park will allow for prime access to the QEII Highway and Anthony Henday, providing connections to both Yellowhead Trail/Trans Canada Highway.
(http://www.dawsonwallace.com/current-projects/)

Involvement: We were honored to be involved through document review and roof progress quality assurance reviews. 

Architect: Gibbs Gage Architecture


LEMARCHAND MANSION

Date: March – May 2015

Description: LeMarchand Mansion is an early twentieth century, four-storey building situated on three lots in Edmonton's Oliver district overlooking the North Saskatchewan River. The H-shaped building embodies Beaux Arts architectural influences and features a red brick facade with sandstone window details, cornice and columns.

Involvement: Goodwin Roof Inspections was involved alongside Rescom in providing progress roof assurance reviews during the roofing process.

Architect: Dialog Architecture


NAIT - CENTRE FOR APPLIED TECHNOLOGY

Date: September 2014 – September 2016

Description: NAIT's Centre for Applied Technology is the new home of the JR Shaw School of Business. Opened in August 2016, the Centre for Applied Technology is the largest capital project in NAIT’s history. The 51,600 square metre building welcomes some 5,000 full-time students to study in leading-edge classrooms, labs and simulation environments.

Students are immersed in real-life scenarios encountered on the job, undergoing the training necessary to use relevant technology, equipment and processes in a controlled environment.

Involvement: Goodwin Roof Inspections & Consulting (1999) Ltd. is pleased to be involved in this project by providing roof progress quality assurance reviews, working alongside the incredible team at NAIT.

Architect: Stantec Architecture


NAIT - PRODUCTIVITY & INNOVATION CENTRE

Date: June 2017

Description: A guiding objective for the PIC is to enable industry in Alberta and western Canada to become more competitive and sustainable through increased technology utilization, enhanced productivity and reduced environmental impact. The Centre will support the creation and introduction of new products and processes that address challenges, both at the industry level and at individual companies.

Involvement: Goodwin Roof Inspections was honoured to be involved in this project by providing roof progress quality assurance reviews, working alongside the incredible team at NAIT.

Architect: GEC Architecture


NORTHERN LIGHTS REGIONAL HEALTH CENTRE

Date: November 2016 – October 2021

Description:  The Northern Lights Regional Health Centre provides a number of services to the residents of Fort McMurray and surrounding areas, including a full time emergency department.

Involvement: Goodwin Inspections was retained by Alberta Infrastructure to assist with progress inspections during the roof replacement on this facility, assisting with obtaining an Alberta Roofing Contractors’ Association warranty.

Architect: Rockliff Pierzchajlo Architects & Planners Ltd.  


OLD STRATHCONA LIBRARY

Date: March 2016 – May 2017

Description: The Old Strathcona Branch, one of the oldest libraries in Alberta, completed in 1913, was the first library erected in the City of Edmonton. The Strathcona Library does have a complex background as to its historical status within the Edmonton Public Library system. It is located on 104th Street, a block off of Whyte Avenue in the heart of Old Strathcona. The roof system was in need of replacement, including the low and steep slope sections. This had to be accomplished while maintaining the historical value and appearance.

Involvement: Goodwin Roof Inspections developed a roof specification to allow for the replacement of the roofing system, as well as the progress quality assurance reviews during the replacement. It was designed to improve performance while maintaining the iconic, historic appearance of the building.  

Specifier: Goodwin Roof Inspections & Consulting (1999) Ltd.


STANTEC TOWER - ICE DISTRICT

Date: December 2016 – Present

Description: Stantec Tower is Edmonton’s most iconic landmark. The 66 storey development will soar over existing downtown buildings and is Western Canada’s tallest tower.
(http://icedistrictproperties.com/offices/stantec-tower/)

Involvement: Goodwin Roof Inspections & Consulting (1999) Ltd. is pleased to be involved in this project by providing roof inspection services. Our firm has experience in providing the necessary on-site technical support and can assist with clear communication between all parties for the successful construction on this type of development. It is our commitment to ensure proper installation of all roofing components and proper co-ordination of interaction of all related trades and materials.

Architect: Stantec Architecture


THE EDWARD

Date: February 2023 – February 2024

Description: Construction of a 13 storey residential tower that will contain 161 units, along with underground parking and a podium terrace.
(https://majorprojects.alberta.ca/details/The-Edward-Apartments/10833)

Involvement: Goodwin Roof Inspections was honoured to be involved in this project by providing building envelope quality assurance reviews.

Architect: Gardner Architecture Incorporated


THE ULTIMA

 

Date: December 2018

Description: Ultima condominiums is an iconic tower in an iconic location. Feel the pulse of downtown living one half of one block from every amenity imaginable…, directly in the financial core. Live The Ultima lifestyle in the most luxurious building in the most dynamic centralized location.
Imagine... Edmonton City Centre Mall, YMCA, Cineplex, Museum, Arena Entertainment District, LRT, U of A downtown campus, Indoor pedway connecting the entire financial district. All touching your front doorstep.
(http://www.ultimatower.ca/location.html)

Involvement: We were pleased to be asked to provide a roof assessment of the iconic Ultima Tower in downtown Edmonton, working alongside Group Three Property Management.